Black Box KV3000 User Manual Page 107

  • Download
  • Add to my manuals
  • Print
  • Page
    / 121
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 106
106
SERVSWITCH™ AND SERVSWITCH ULTRA™
Before putting the Serv unit’s top cover back on, test the unit as directed in steps
23 through 28.
23. Temporarily connect the Serv unit to a monitor, keyboard, and mouse, along
with at least one CPU for every PCB in the Switch. (On a twelve-port unit, for
example, one CPU should be attached to port 1, one CPU to port 5, and one
CPU to port 9.)
24. Plug the Serv unit back in and turn it ON. (If, using the configuration
currently stored in its NVRAM, the unit won’t be able to switch to all of the
test CPUs, you might have to change the ServSwitch’s or ServManager’s
Maximum Ports, Width, and Units values, or just perform a factory reset.
Refer to the appropriate sections of your Serv unit’s manual.)
25. Turn ON the attached monitor and CPUs.
26. Make sure that the Serv unit’s front-panel controls and keyboard commands
will still scan and switch between all of the CPUs from the front panel as
before. If the Serv unit does not respond properly, call Black Box for
technical support.
27. Press and release the shared keyboard’s left [Ctrl] key, then its [F12] key. The
Overlay Option Board’s main menu should appear. If it repeatedly fails to
appear, call Black Box for technical support.
28. Press the up- and down-arrow keys to move the cursor among the menu
selections. Press [Enter] to choose a selection and bring up a submenu. Press
[Esc] to return to the main menu. Press [Esc] again to quit the overlay menus
and return to normal operation. If any of these functions fails to work, call
Black Box for technical support.
29. If the Serv unit seems to be working properly, turn OFF the unit and all
attached test equipment. Unplug the unit from utility power and disconnect it
from the test equipment.
30. Replace the Serv unit’s top cover.
31. Refasten the top cover by screwing the screws that you removed in
step 2 back in.
Once you reconnect it to its normal system (and, if necessary, rebuild its normal
configuration), the ServSwitch or ServManager, including its new Overlay Option
Board, should be ready for continuous operation.
Page view 106
1 2 ... 102 103 104 105 106 107 108 109 110 111 112 ... 120 121

Comments to this Manuals

No comments