Black Box KV3000 User Manual Page 116

  • Download
  • Add to my manuals
  • Print
  • Page
    / 121
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 115
115
APPENDIX F: Installing the 4-Port Expansion Board
Once you reconnect the Switch to its normal system (rebuilding, if necessary, its
normal configuration), you can attach additional computers to the Switch’s new
CPU ports if all lower-numbered ports are occupied. Power up the system and issue
a Maximum Ports command (left-[CTRL] Pxxx , where xxx is the total number of
occupied CPU ports) that reflects the new ports/computers you’ve just added.
Once you’ve done so, the ServSwitch, including its new CPU ports, should be ready
for continuous operation.
Figure F-5. Top view of the 4-Port Expansion Board (and previously
installed PCBs).
Step 10: J3
Step 14: J14
J3
Step 8: Nuts
and washers
Step 8: Might
also be a nut
and washer
here
Page view 115

Comments to this Manuals

No comments